The proposed US 290 direct connect interchange will bridge over State Highway 36 just south of the current clover leaf intersection. In Spring of 2021, based on TxDOT’s technical evaluation, local stakeholder and public input, we announced through a press release that Revised Concept B – Central Direct Connect was the selected alternative for further development, which consists of a modernized direct connect interchange design that would ultimately replace the existing clover leaf intersection. Right-of-way acquisition would be required for all concepts.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |